Monday, June 17, 2013

Attic Reno 4

The attic continues to take shape.  Wall construction is now complete, plumbing is in place, and electrical wiring was installed over the weekend.
 Justin has finished all the knee walls and has completed framing around the old windows in preparation for the new windows coming in.  As you can see in the picture below, the new windows will be quite a bit larger, allowing in some great natural light.
 The picture below shows where the pocket door will be placed which will lead into the closet and adjoining bathroom.
 Several LED recessed lights have been installed throughout. 
 We had another great group of friends who came and helped move dry wall up to the attic.  Soon on to the next phase.